A contractor's guide to armoured cable glanding and earthing: tooling, seven-step termination sequence, six common mistakes and the tests to run before energisation.

Most armoured cable failures we investigate are not cable failures at all — they are termination failures. A gland that is over-tightened, an earth tag left loose, or a sheath cut back too far will destroy a perfectly good drum of SWA cable within one rainy season. This is the termination sequence we recommend to contractors.

Why the Armour is the Earth Path

In a typical buried distribution circuit, the armour doubles as the circuit protective conductor. That works because steel armour has a low resistance and a large surface area for heat dissipation during an earth fault. It only works, however, if the armour is mechanically and electrically continuous from gland to gland — which is a termination question, not a cable question.

Tools and Components

  • Correct-size brass or nickel-plated brass gland (CW, BW or A2 type depending on cable and enclosure).
  • Earth tag, locknut, shroud and a brass or tinned copper earth tail.
  • Armour cutting tool or hacksaw with depth stop, cable knife, and a bonding conductor sized to the circuit.
  • Insulation resistance tester and a low-resistance ohmmeter for continuity.

Termination Sequence, Step by Step

  1. Measure and mark the sheath cut-back against the gland body length plus enclosure wall thickness.
  2. Cut the oversheath carefully along the axis only where the gland will clamp — do not score the armour wires.
  3. Expose the armour to the depth required by the gland, keeping the bedding intact under the armour.
  4. Fit the gland body and earth tag, then tighten the armour clamping ring so the wires are captured, not crushed through.
  5. Bed the cone into the sheath to create the seal, then fit the shroud.
  6. Connect the earth tail from the earth tag to the enclosure earth bar with a crimped lug — not a twisted wire.
  7. Test: insulation resistance core-to-core and core-to-armour, then earth continuity from gland to gland below 0.1 Ω.

Six Mistakes That Cause Water Ingress

MistakeConsequence
Sheath scored while strippingRadial crack propagates, water reaches armour
Armour wires cut unevenlyGland seal incomplete, low pull-out strength
Gland over-tightenedBedding crushed, insulation pinched, reduced dielectric strength
Earth tag omitted or looseArmour not earthed, fault current finds another path
Cable not supported near glandWeight loads the termination, seal opens over time
Indoor gland used outdoorsNo IP seal, water tracks into the enclosure

Earthing Both Ends or One End?

For LV circuits, earth the armour at both ends. For single-core cables in parallel, the arrangement needs care because circulating currents can flow in the armour; in that case use aluminium wire armour or a single-point bonding scheme designed by the electrical engineer. Never leave an armour floating at a cable joint — a joint kit that does not restore armour continuity is a latent fault.

Testing After Jointing

  • Insulation resistance: 1 kV tester for LV circuits, values typically above 100 MΩ.
  • Voltage test: 3.5 kV / 5 min for 0.6/1 kV cable, per IEC 60502-1.
  • Earth continuity: from the far gland to the switchboard earth bar, below 0.1 Ω.
  • Sheath and gland inspection: shroud seated, no exposed armour, enclosure IP rating restored.

For cable construction and armour selection, see the armoured electrical cable guide and the armoured cable selection guide.

armoured cable glanding SWA earthing cable termination earth continuity
About The Author
Ms. Mayling Zhao
Ms. Mayling Zhao
As a Senior Cable Application Engineer at SHANCABLE, I bring 10+ years of technical experience in medium and high-voltage power transmission. I specialize in XLPE cable specifications, copper tape shielding, and IEC 60502-2 compliance, helping infrastructure projects select safe and reliable power solutions.
Posts: 173 Latest: 2026-10-19
Senior Cable Application Engineer 10+ Years MV/HV Cable Experience IEC & KEMA Standards Specialist
search…